case study
 
 

Previous Project:

Redbourn Golf Club - Golf Driving Range Upgrade

Redbourn Golf Club partnered with JHP as their electrical and lighting contractor to deliver a major driving range upgrade — integrating advanced lighting, heating, AV, and ball‑tracking technology.
 

Background information

Redbourn Golf Club, part of Burhill Golf and Leisure Ltd (BGL Golf), is a premier golfing destination in Harpenden, Hertfordshire. With two scenic courses, a modern clubhouse, and a cutting-edge driving range, it is known for its high-quality facilities.

As part of BGL’s commitment to enhancing visitor experience through technology and comfort, they invested in a major upgrade to the driving range — entrusting JHP Electrical as the electrical contractor and specialist in golf range lighting and ball-tracing technology.

Project overview

JHP Electrical delivered a full-scale electrical and AV infrastructure upgrade at Redbourn Golf Club’s driving range, with all works certified to installation standards, system testing and commissioning.

Key elements of the project included:

  • Installation of bay heating systems
  • Upgraded range lighting to enhance visibility and usability in all conditions
  • Full containment and cabling for Trackman radar systems, including power, data and TV’s
  • AV installation for televisions and integrated sound systems across the range
  • Installation of new SWA (steel wire armoured) supply cables to support robust power distribution
  • Groundworks in collaboration with subcontractor New Century Landscaping, including trenching and ducting across car park and tee areas and pole positioning and reinstatement of disturbed surfaces

Strategic approach

JHP Electrical adopted a phased, collaborative strategy to ensure minimal disruption and maximum efficiency:

  • Site Coordination: Aligned trenching and containment routes with AV and power needs
  • Technology Integration: Delivered precision cabling for Trackman radar and display systems
  • Safety & Compliance: Installed SWA cabling and heating systems to meet BS-7671:2018 regulations
  • Operational Flexibility: Scheduled works around active public areas to maintain safe access and uninterrupted service

Results and achievements

  • Improved comfort and usability with enhanced heating and lighting
  • Seamless deployment of Trackman radar and AV systems
  • Robust infrastructure supporting long-term scalability
  • Efficient collaboration ensured timely delivery and high-quality finish

Client satisfaction

BGL Golf expressed strong appreciation for the quality and professionalism demonstrated throughout the Redbourn upgrade. From initial planning to final commissioning, JHP Electrical maintained clear communication channels, ensuring that project milestones were met without disruption to the club’s daily operations.

Conclusion

Following the success at Redbourn, JHP Electrical was commissioned to deliver projects across multiple BGL Golf sites, including Wycombe Heights Golf Centre, Birchwood Golf and Country Club, Thornbury Golf Centre, and Abbey Hill Golf Centre.

JHP will also return to Redbourn in 2026 to carry out the electrical works for a driving range extension in partnership with Clark’s Construction. This will include all internal lighting, power, and AV installations, as well as external range lighting solutions.

Back to projects
linkedin
Share this project
“The JHP team are professional, highly skilled, and well-organised, delivering on time and within budget. Communication was seamless, and customer feedback on the improvements has been outstanding. I highly recommend JHP for golf community projects, as their expertise and dedication to excellence have consistently surpassed our expectations.” — BGL Golf